Automation
A New Way to Control Your Building
Transform building management with advanced Automation tool. Control air conditioners, radiators, lights, sockets, and HVAC equipment effortlessly. Ensure optimal comfort and enhanced occupant experience. Experience the future of building management today.
Remote On/Off
The Remote On/Off empowers users with the ability to control their HVAC equipment remotely. With just a few taps on their devices, users can conveniently turn on or off air conditioners, radiators, lights, and other connected devices.
Time Schedules
The Time Scheduling allows users to schedule the operation of their equipments based on specific time periods. This enables them to optimize energy consumption by aligning the operation of equipment with occupancy patterns and desired comfort levels, resulting in efficient and cost-effective building management.
Smart Scenarios allow for the creation of intelligent control scenarios by integrating data from various sensors such as occcupancy, door/window, energy consumption, and outdoor weather. This enables the system to dynamically adjust air conditioner, radiator or lights based on real-time information, optimizing energy usage and ensuring optimal comfort.
Set Temperature Control
The Set Temperature Control enables users to precisely adjust and control the desired temperature in their building. Users can set specific temperature thresholds for their HVAC systems, ensuring optimal comfort levels for occupants.
Fan Level ControlĀ
The Fan Level Control feature enables users to adjust the speed and intensity of their air conditioner fans. Users have the option to set low, medium, or high fan settings based on their comfort preferences and energy-saving objectives.
